Tools laid out next to a water pump ready for maintenance

Support Center

We're here to help you every step of the way.

Installation

Inspection of Existing System

This process involves inspecting the existing system to verify the presence of any electrical floaters, which are preferably removed. The presence of any mechanical floaters in the Roof Tank should also be checked, and its removal is also preferred. The valves along the suction and discharge piping must be inspected to ensure they are intact, free of obstructions, functioning correctly, and in the fully open position. All pipe wiring should be examined to ensure they are sound and free of leaks or cracks. It is essential to confirm the absence of any branches along the pipeline from the Ground Tank to the Roof Tank. If any branches are found, they must be completely closed. If their use is necessary, they should be operated manually only. The pump must be inspected for proper operation, including performance and sound. It should operate smoothly, without strong vibrations or unusual noises. The pump should be checked for any signs of leaks or seepage and verified for adequate pumping performance. The pump specifications must adhere to the following:
  • Two-wire electrical wiring
  • Electrical power not exceeding 2 horsepower
  • 220-volt operation
  • Note: The Tamam device is compatible with surface and submersible pumps only; pressure pumps are not supported.

Still need help with your device?

Contact us